Cardiogram Product & Engineering Roadmap
Q3–Q4 Alignment & Goals
Local Mode Only
Database Configuration Issue
Checking...
Changes will be saved locally only and won't persist after page refresh.
- Apple Health UI Exposure: Fix visibility in onboarding & settings. Ensure clean selection and tracking flow.
- Authentication & Consent Overhaul: Finalize auth provider, implement verified email/password login, and assign stable
cgUserId. - Trigger updated terms and consent to all users.
- Implement DOB collection to calculate Lucra eligibility and lead gen marketing.
- Subscription Trial Logic Update: Rework 30-day trial to 7 or 14 days. Update all related copy.
Dev: 2 weeks
QA: 2 weeks
Target: 4 weeks total
- Finalize backend API schemas and align outputs with Figma designs.
- Implement UI for result delivery and downstream CTA.
- Confirm result storage by
cgUserIdfor personalization and lead generation. - Conduct final testing for UI, API response handling, and data synchronization.
Remaining Dev: 2 weeks
QA + Stabilization: 2 weeks
Target: ~4 weeks until go-live
Rook Integration
- Begin integration mid-Phase 2 to ensure smooth transition.
- Offload device syncing responsibilities to the Rook platform.
- Map Rook device data into Cardiogram's existing logic.
- Remove or deprioritize internal device logic where applicable.
- Run comprehensive QA on syncing, onboarding flow, and fallback behavior.
Dev: 2 weeks
QA + Rollout: 2 weeks
Target: 4 weeks total
UI Refresher
Infrastructure Update
- Create updated Figma assets for full Cardiogram app.
- Implement updated design system elements from a dev standpoint (typography, spacing, colors).
- Optimize key user flows for improved usability and visual consistency.
Design + Dev: 2 weeks
QA: 1 week
Target: 3 weeks total
- Begin prep work mid-Phase 3.
- Integrate Lucra SDK into Cardiogram (iOS + Android).
- Pass
cgUserIdand storelucraUserIdfor user mapping. - Implement "Challenges" section using the Lucra SDK.
- Ensure consent enforcement is complete before rollout.
Dev: 3-4 weeks
QA + Security: 2 weeks
Target: ~5-6 weeks
Roadmap Timeline Summary
Phase 1: Apple Health, Auth & Subscription
Dec 6 → Jan 3
4w
🟢 On Track
Phase 2: Face Scan Integration
Jan 3 → Jan 31
4w
🟢 On Track
Phase 3: Rook Integration + UI Refresher
Jan 31 → Mar 21
7w
🟢 On Track
Phase 4: Integration
Mar 21 → May 2
6w
🟢 On Track
Overall Target Completion
Sat, May 2, 2026